Things to note when installing steel structure platforms!!
You are here: Home » News » Things to note when installing steel structure platforms!!

Things to note when installing steel structure platforms!!

Views: 0     Author: Site Editor     Publish Time: 2024-01-12      Origin: Site

Inquire

wechat sharing button
line sharing button
twitter sharing button
facebook sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button
Things to note when installing steel structure platforms!!

1. The unloading channel should be equipped with load limit signs.

2. The placement point and upper tie point of the steel structure platform must be located on the building and must not be set on construction equipment such as scaffolding. The support system must not be connected to the scaffolding.

3. The concrete beam slab at the placement point of the steel structure platform should be embedded and connected with the bolts of the channel.

4. The horizontal angle between the wire rope and the channel should be 45 to 60 degrees.

5. The tensile strength of the beams and columns at the upper tie points of the channel should be checked to ensure the safety of the building and the channel.

6. The platform can be lifted using a tower crane. Snap rings should be used when lifting the platform, and the hook should not be directly hooked on the platform lifting ring.

7. When installing the steel structure platform, the steel wire rope should be hung with a special hook. When using other methods, there should be no less than 3 buckles. The steel wire rope should be lined with soft cushions around the sharp corners of the building. The outer entrance of the steel structure platform should be Slightly higher than the inside.

8. Fixed parallel railings must be installed on the left and right sides of the steel structure platform and dense mesh safety nets must be hung.

9. When erecting scaffolding, the location of the steel structure platform should be reserved, and the vertical poles of the scaffolding on both sides of the channel should be reinforced with double vertical poles.


Oct. 2010 , Lutsen Technik Co., Ltd, was founded in October 2010. In addition to Brückner, Lutsen also has business relations with Olbrich, Sturm, Hennecke and Trützschler.

CONTACT US

Phone:+86-510-8697-8615
Email:wei@jyklt.com
             Alex.Chen@jyklt.com
Fax:+86-510-8697-8617
Add:No.22  Yumen  West road,  Zongyan Village, Zhouzhuang  Jiangyin 214423 Jiangsu P.R. China

QUICK LINKS

PRODUCTS CATEGORY

SIGN UP FOR OUR NEWSLETTER

Copyright © 2024 Jiangyin Quality Machinery Co.,Ltd. All Rights Reserved.